Lockheed Martin
Crestview, FL
Description: Performs the Make, Buy and / or Bill of Material (BOM) planning activities associated with Manufacturing Resource Planning (MRP) transactions. Expedites and optimizes material flow through the supply chain to meet schedule and production requirements. Coordinates with manufacturing to ensure material delivery in accordance with the production schedule, provides timely status and expedites or works around plans to preserve schedule. Coordinates with Supply Chain Stakeholders including Procurement to determine appropriate plan for procured parts. Coordinates with Engineering and Change Board Rep to make the associated changes to the BOM. Duties Will Include: • Lead MRP for at least one full AC modification at a time • Interface with Master Scheduling, Production Operations and Production Engineering to ensure production and schedule needs are met • Builds and maintains Install Log for assigned ACs • Generate, issue and close production work orders in accordance with...